Explore Ông Kèo Industrial Park lease rates at 180-200 USD/m² in Đồng Nai. 855.6 ha total, 535.3 ha leasable. Near Cát Lái Port (10.5 km) & Long Thành Airport. Check land availability now.
Ông Kèo Industrial Park


Ông Kèo Industrial Park (Tinnghia IP) 2026 Data Sheet

Metric

Value

Total area

855.6 ha

Leasable industrial land

535.3 ha

Occupancy rate

59%

Lease term

Until 2058

Riverfront land fee

200 USD/m²

Standard land fee

180 USD/m²

Developer

Tín Nghĩa Corporation

Location

Đại Phước, Nhơn Trạch, Đồng Nai

Hotline

+84 976 776 960 (Mr. Huy)

 

khu công nghiệp ông kèo

1. Location & Logistics Connectivity

Destination

Distance

Drive Time

Cát Lái Port

10.5 km

43 min

Phước An Port

15 km

50 min

Long Thành Int’l Airport

23.3 km

38 min

Tân Sơn Nhất Airport

30 km

80 min

HCMC Center

51 km

65 min

Biên Hòa

48 km

80 min

Bà Rịa – Vũng Tàu

65 km

90 min

Key advantage: Multimodal logistics (road, waterway, air) within a 45‑minute radius.

2. Land‑Use Structure

Category

Area (ha)

% of total

Industrial land

535.3

62.56

Service centre

52.4

6.13

Green space / water surface

148.2

17.32

Technical infrastructure

12.8

1.50

Roads & port access

106.9

12.49

Total

855.6

100

Note: Over 200 ha still available (41% of industrial land).

3. Developer

·       Name: Tín Nghĩa Corporation (Tinnghia Industrial Park)

·       Role: Master planning, infrastructure development, land lease contracting, park management.

4. Eligible Industries (2026)

Sector

Restrictions

Lubricant oil processing

LPG / liquefied gas

Chemicals

Excluding basic chemicals

Pharmaceuticals & cosmetics

Food processing

Power generation

Postal & telecom

Mechanical engineering

Paper production

Excluding pulp

Plastics & rubber

Excluding raw rubber processing

Construction materials

Textiles & garments

No dyeing

Footwear

No tanning

Various services

Subject to zoning

Environmental standard: Wastewater must comply with QCVN 40:2025/BTNMT.

các ngành nghề


5. Lease Rates & Payment Terms

Infrastructure fee (one‑time, until 2058)

Lot type

Fee (USD/m²)

Riverfront

200

Standard

180

Excluding VAT.

Additional annual fees

Item

Rate

Land rent

As per Đồng Nai provincial decision

Management fee

1.0 USD/m²/year

Payment schedule

Step

Timing

Amount

Deposit

Within 10 days of MOU

10% of infrastructure fee

1st payment

Within 10 days of formal contract

50% of infrastructure fee

2nd payment

Within 3 months of contract (after deposit deduction)

Remaining 50%

Annual land rent & management fee

By January 15 each year

Full annual amount

 

6. Utilities & Operating Costs

Service

Rate

Notes

Clean water

18,000 VND/m³

Supply: Nhơn Trạch plant (20,000 m³/day) + backup from Thiện Tân (200,000 m³/day)

Wastewater treatment

0.6 USD/m³

Excluding VAT; calculated as 80% of water consumption

Electricity

National grid rates

22KV supply

Management fee

1.0 USD/m²/year

Excluding VAT

Quick cost estimator (monthly):
(Water m³ × 18,000 VND) + (Water m³ × 80% × 0.6 USD × exchange rate)

7. Technical Infrastructure

Component

Specification

Internal roads

Width 19–61 m, 2–6 lanes, designed for heavy containers

Power supply

22KV from national grid

Water supply

20,000 m³/day (expandable via Thiện Tân)

Wastewater treatment

Phase 1: 3,000 m³/day, standard QCVN 40:2025

Telecom

VNPT, FPT, Viettel – ADSL up to 8 MB/s, fiber up to 90 MB/s

On‑site port

30,000 DWT capacity, shared by all tenants

 

8. Administrative Support

The developer provides on‑site assistance for:

·       Investment registration (certificate, seal, tax code)

·       Customs clearance & import/export procedures

·       Freight forwarding & cargo transport

9. Pre‑Lease Checklist

Before signing, confirm these 5 points with the developer:

1.    Lot location – riverfront (200 USD/m²) or standard (180 USD/m²)

2.    Current availability – exact lot size and position (occupancy changes daily)

3.    Industry approval – matches zoning + QCVN 40:2025

4.    Total cost estimate – infrastructure + land rent + management fee + utilities + VAT

5.    Payment schedule – align with your project cash flow

10. Contact – Nam Hoàng Long

We specialise in industrial land and factory rentals in Nhơn Trạch, Đồng Nai.

We provide:

·       Real‑time lot availability

·       On‑site inspections

·       Cost calculations tailored to your industry

·       Direct negotiation with the developer

To get started, send us:

·       Required area (m² or ha)

·       Industry type

·       Estimated budget

We’ll match you with the best available lots – no spam.

📞 Hotline: +84 976 776 960 (Mr. Huy)
🌐 Website: namhoanglong.com.vn

11. FAQs (Short Answers)

Where is Ông Kèo IP?
Đại Phước, Nhơn Trạch, Đồng Nai – 10.5 km from Cát Lái Port.

Total area?
855.6 ha total, 535.3 ha leasable.

Developer?
Tín Nghĩa Corporation (Tinnghia Industrial Park).

Lease rate?
200 USD/m² (riverfront) / 180 USD/m² (standard), until 2058.

Land still available?
Yes – 59% occupied, ~41% free (confirm directly).

Distance to Cát Lái Port?
10.5 km, ~43 minutes.

Distance to Long Thành Airport?
23.3 km, ~38 minutes.

Lease term?
Until 2058.

Whom to contact?
Nam Hoàng Long – +84 976 776 960.

All data verified against the developer’s latest official project documentation. Rates and availability subject to change – contact us for real‑time confirmation

   [/tintuc] 

 

036.78.78.780